High Rise Construction Work Platforms For Efficient Loading And Unloading
The Crane Loading Deck is specially designed for coping with the challenges of multi-story construction sites. Our crane loading decks make access for tools and materials to different levels of multi-story construction sites safe and simple, while increasing the working efficiency of tower cranes.
- Easy pull/push system
- Max. outboard length: 5.3m
- Max. load capacity: 5 ton
- Platform width: from 2.2m to 4.2m
- With adjustable props for different floor heights
- Compact design makes transportation & installation much easier
- With easy locking system
- All pins are with chains
| Specification | MLP2200 | MLP2600 | MLP3200 |
|---|---|---|---|
| Width W (mm) | 2200 | 2600 | 3200 |
| Length L1-L2 (mm) | |||
| - Minimum Length | 5650 | 5650 | 5650 |
| - Maximum Length | 9400 | 9400 | 9400 |
| Height of prop H2 (mm) | |||
| - Minimum Height | 2600 | 2600 | 2600 |
| - Maximum Height | 3400 | 3400 | 3400 |
| Side panel height H1 (mm) | 1200 | 1200 | 1200 |
| Extend length of movable deck L2 (mm) | 3750 | 3750 | 3750 |
| Overhang length of stationary frame L5 (mm) | 1450 | 1450 | 1450 |
| Tare Weight (KG) | 2300 | 2800 | 3350 |
| Max Loading Weight (KG) | 5000 | 5000 | 5000 |
Distinctively designed, delicate production, and quality tested.
There are three sizes available for the Retractable Unloading Platform, with different load capacities, width sizes, and floor heights to meet the needs of various users.
It can be applied to almost all types of buildings and will not hinder the completion of the building exterior. Suitable for floors of different heights — the height of the supporting columns can be adjusted. If the ceiling is high, support columns over 4 meters can be provided, or full body bolts can be used to anchor the platform directly to the floor (without the need for support columns).
Upon arrival at the construction site, the load deck can be installed and used immediately. Installation can be completed by one crane driver and one worker. Transfer to another floor or removal from the site can be done within 10 minutes.
Extremely low maintenance costs. The platform can be extended and retracted by only one person, without the need for power or control equipment.
Adopts hot-dip galvanizing and high-quality paint for corrosion prevention.
Series 1: For the waste recycling/management: skip bins/Roll of dumpster/hook lift bins/tipper bins etc.
Series 2: For the shipping and storage: foldable platform/transfer bin, shipping containers etc.
Series 3: OEM Equipment: (house container/a special purpose container)
High Rise Construction Work Platforms
,Loading Construction Work Platforms
,Unloading Construction Work Platforms
-
Outdoor Scrap Metal and Garbage Disposal Skip Bin Customized Heavy Duty Industrial Loader with 3-4mm Sidewalls
Tempat loncatan industri tugas berat dengan dinding samping 3-4 mm, lantai 4-5 mm, dan pengelasan halus. Ukuran custom (2-50CBM), pengecatan epoxy, dan garansi 1 tahun. Ideal untuk potongan logam, pembuangan sampah, dan daur ulang. -
Heavy-Duty Skip Bin for Construction Waste 4-5mm Floor
Tempat sampah tugas berat dengan lantai 4-5 mm & dinding 3-4 mm. Garansi 1 tahun, opsi khusus (pintu/tutup), dan kepatuhan Australia. Dibangun untuk limbah konstruksi dengan konstruksi baja tahan lama. -
Marrel Skip Bins – China Manufacturing, Australian Standards: Durable & Affordable Solutions for Bin Hire Businesses
Tempat sampah yang tahan lama dibuat dari baja 3-4 mm, sesuai dengan standar Australia. Fitur-fiturnya termasuk pintu opsional, pengelasan halus, pengecatan epoksi, dan garansi 1 tahun. Dapat disesuaikan untuk keperluan perumahan, konstruksi & industri.